1099 Subcontractor Crew · Southern Utah

Turn·Key Construction

Fiber builds from the ground up.

Full-spectrum fiber, copper, and enclosure work for GCs across Southern Utah. One crew from bore to splice.

6+ Years in the Ground
800+ Miles of Fiber
50+ GC Partners

Our Capabilities

Everything your fiber project needs, handled by one experienced crew.

Outside Plant

Full OSP construction — aerial and underground. Conduit, handholes, pedestals, and everything between the central office and the premises.

Fiber Placement

Directional boring, trenching, and aerial lashing. We place backbone and distribution fiber with precision across any terrain.

Splicing & Termination

Mass fusion splicing, termination panels, and OTDR-certified testing. Ribbon and single-fiber, indoors or in the field.

Copper Builds

Copper cable placement, termination, and testing for hybrid builds and legacy plant work through the transition to full fiber.

Service Area

Based in Cedar City, covering the full Southern Utah corridor. We deploy across the region with our own fleet and gear — no logistics delays, no remote upcharges.

Cedar City St. George Hurricane Washington City Kanab Page AZ

Coverage at a Glance

Primary Base Cedar City
Service Radius 150+ miles
Travel Policy No remote fees
Fleet Status Ready to roll

Recent Projects

Real work. Real results. From backbone to last mile.

OFDC enclosure build during Washington Fields FTTH project

Washington Fields FTTH

Full OSP deployment for a 600-home subdivision. Conduit, handholes, enclosures, and drop terminations — from street to sidewall.

OSP FTTH 600 homes
Completed fusion splice tray with organized fibers

Splicing & Termination

Fusion splicing, pigtail terminations, splitter and enclosure builds across multiple project types. Every strand logged and tested.

Splicing Termination Testing
Tower construction during Iron County backbone project

Iron County Backbone

38-mile long-haul route across rugged terrain. Directional bore, tower placement, and aerial lashing connecting rural communities.

Backbone Long-haul 38 miles
Wall-mounted enclosure in St. George MDU project

St. George MDU

Inside plant for a 48-unit multi-dwelling unit. Termination panels, riser cable, and premise wiring — clean installs in every unit.

MDU Inside plant 48 units
View Full Gallery — see all 20 project photos

For General Contractors

Built for the pace of real construction. No runaround, no hidden costs.

Quotes in 48 Hours

Detailed, line-item quotes within two business days. No vague estimates — just clear numbers you can bid with.

Full Crew + Gear

Boring rigs, bucket trucks, fusion splicers, OTDRs. We show up self-contained — no equipment rentals or crew assembly needed.

Insured & Compliant

Fully insured, OSHA-compliant, and ready for prime GC projects. All the certs and paperwork your safety department needs.

Request a Bid

Tell us about your project. We will get back to you within 48 hours.

Contact Information

Service Area
Southern Utah & Northern Arizona